New Arrivals/Restock

Prevue Pet Products Heavy-Duty 30 Ft Tie-Out Chain - Zinc Plated Oval Safety-Welded 3.8 mm Links, Dog Tie Out for Yard, Long Lead for Dogs Up to 150 Pounds, Cast Iron Swivel Bolts, Outdoor Use - 30 Ft

flash sale iconLimited Time Sale
Until the end
22
53
23

US$14.99 cheaper than the new price!!

Free shipping for purchases over $99 ( Details )
Free cash-on-delivery fees for purchases over $99
Please note that the sales price and tax displayed may differ between online and in-store. Also, the product may be out of stock in-store.
Used  US$10.00
quantity

Product details

Management number 217903676 Release Date 2026/05/03 List Price US$10.00 Model Number 217903676
Category

Prevue Pet Products 2126 Heavy-Duty 30' Tie-Out Chain,Silver

  • TIE OUT CHAIN FOR OUTSIDE USE - This heavy-duty metal tie-out provides a strong, dependable way to secure larger dog breeds outdoors, allowing controlled freedom of movement while maintaining safety
  • DURABLE DESIGN - Designed for outdoor use, this tie-out is a durable alternative to a leash, offering reliable restraint for dogs without the stretch or wear found in fabric or cable options
  • STRONG, CHEW-PROOF CHAIN BUILD - Constructed from zinc plated steel, this chain helps resist chewing and weather exposure, delivering dependable performance for active outdoor dogs
  • VERSATILE SIZE RANGE - Suitable for medium to large dogs, the 30' length allows roaming without confinement, making it an ideal option for everyday outdoor use, travel, camping or yard setups
  • ABOUT PREVUE PET - Since 1869, Chicago-based Prevue Pet Products has built a well-deserved reputation for safe, high-quality, well-designed products for domesticated pets and their human companions
UPC 048081021262
Size 10-"
Color Black
Pattern Solid
Brand Name PH Prevue Hendryx
Unit Count 1 Count
Item Weight 4 Pounds
Closure Type Snap
Manufacturer PREVF
Material Type Zinc-plated steel
Dog Breed Size Large
Item Type Name Prevue Pet Products 2126 Heavy-Duty 30' Tie-Out Chain,Silver
Target Species Dog
Included Components Prevue Pet Products 2126 Heavy-Duty 30' Tie-Out Chain,Silver
Warranty Description Warranty
Item Display Dimensions 10 x 8.13 inches
Global Trade Identification Number 00048081021262

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Product Review

You must be logged in to post a review